Skip to main content Scroll Top

Post-Template

Last Updated on August 19, 2026 by Seth Lieberman

On Monday, August 10, 2026, the Florida Department of Transportation (FDOT) activated a temporary traffic signal on U.S. 192 (W. Irlo Bronson Memorial Highway) east of Interstate 4 (I-4).

In this phase, the existing flyover ramp bridges connecting U.S. 192 eastbound to I-4 eastbound will be demolished and reconstructed within the same footprint.

The temporary signal is expected to remain in place through spring 2027.

Navigation Tips:
U.S. 192 eastbound drivers:
For U.S. 192 eastbound, continue eastbound on U.S. 192 past the existing exit to the flyover ramp, crossing over I-4, then make a left turn at the signal only when provided a green arrow (do not turn left otherwise).
Through traffic will have a continuous green light. Do not stop.
The existing on-ramp to I-4 westbound will remain open.

U.S. 192 westbound drivers:
Treat as a standard signal. Be prepared to stop for those turning left to access the on-ramp to I-4 eastbound. The existing on-ramp to I-4 eastbound will remain open.

Recent Posts
Clear Filters

ORLANDO, Fla. — As part of preparing for the construction of the Moving Florida Forward projects along the Interstate 4 (I-4) corridor in northern Polk, Osceola, and southern Orange Counties, the Florida Department of Transportation recently held an Industry Forum for the construction and engineering industries.

August 31
Overnight, 1:00 a.m. to 5:00 a.m.
Activity: Road construction

Most Recent News

Sign up for newsletters today!

* indicates required